Skip to content
TAA

App development in Perth

App development for Perth maintenance suppliers

Give equipment, work orders and competency records a dependable home. A Perth supplier can commission a focused maintenance app remotely, with clear evidence for each completed job.

By , software architect · Last updated

An equipment service app should make the next action obvious: inspect, repair, review or return to service. For a Perth company supplying mine operations, the distinction between recorded evidence and an authorised operational decision belongs in the first workshop.

How do mine-site responsibilities affect the workflow?

Keep statutory appointments separate from ordinary app permissions. WorkSafe WA explains statutory positions and certificates under the mining safety framework. A proposed supplier tool can reference the appointed person and store the relevant evidence. It should not infer that someone holds an appointment merely because an administrator gave them a supervisor account. Your mine operator determines which decisions the workflow must reserve.

What happens when a technician loses connectivity?

The job needs a recoverable local draft and an explicit synchronisation result. For the pilot, I would test a photograph taken offline, a replacement part added later and a supervisor reviewing the same asset from another device. Conflicting edits should remain visible until resolved. The equipment history should distinguish the time work happened from the time a device sent its record, particularly when a maintenance window is being reconstructed.

What changed for WA public-sector information?

The applicable WA framework now needs checking against the July 2026 commencement. The WA Office of the Information Commissioner describes the Privacy and Responsible Information Sharing Act 2024 requirements for information collected from 1 July 2026. Scope public-entity and relevant contracted-provider work accordingly; do not apply that description indiscriminately to private suppliers. Employee records, customer documents and asset telemetry should have separate access decisions.

Which maintenance outcome should be priced first?

Price one equipment family and its complete repair record before adding every department. The demonstration could start with a fault report, proceed through diagnosis and parts used, and end with a named reviewer accepting the evidence. A failed check must remain open. Remote delivery includes a written fixed-price milestone and a handover explaining the status rules, so your maintenance lead can review the behaviour without reading code.

Price, contract and data

  • Every step has a fixed price, set in writing before work starts; extra scope is added only through a change order you approve in writing.
  • The code sits in your repository from day one; with each paid milestone, the rights to everything delivered up to that point pass to you. Third-party components and pre-existing tools keep their own licences.
  • For rescues and new builds, 90 days of free bug-fixing after launch, on top of the 12-month warranty under the Terms. Ongoing operation starts at $1,400 a month.
  • You contract with DigitalFreedom Global LLC, Wyoming, USA. All prices are net; the tax treatment is clarified before contract and stated in the offer.
  • My infrastructure is in the United Kingdom and Europe. Where I process personal data on your behalf, we sign a data processing agreement. The provider overview on digitalfreedom.co.za lists the subprocessors, their locations and the contractual safeguards.

Common questions

Can expiry dates block a job assignment?

Yes, if you supply the rule and identify who may grant an exception. The scope should also define what happens to an already assigned job when a document expires, and how that exception is recorded.

What is the starting engagement for inherited software?

An App Check at $2,000 can examine the existing maintenance workflow, offline behaviour and access model. Its findings establish which repairs belong in the next fixed-price step.

Review the equipment history

Start with an asset that has returned for repair and the job cards from its previous visits. The discussion can follow the serial number, replacement parts and outstanding recommendations through each event. Include a technician’s offline record if one exists, with personal details removed. We can then specify what the supervisor must be able to reconstruct, which appointment evidence belongs elsewhere and which failure would make the pilot unacceptable.

Free 30-minute call, no obligation

You talk to Marcel directly, the architect who is accountable for the work. No sales rep, no pitch.

The calendar is served by Cal.com. It loads only after you click (data goes to Cal.com, US). Privacy policy

Prefer to write first? Describe your situation, with a link to your app, repository or questionnaire. You get an answer within one business day.