Christchurch City Council provides a building-inspection booking service. A contractor’s own app can organise preparation around that process, while keeping council bookings and decisions identifiable as external records.
What should be ready before an inspection is booked?
The proposed app should show whether the responsible site team has supplied the items in its agreed readiness checklist. A drawing reference, location and named contact are more useful than a single unchecked attachment folder. I would make missing evidence visible before a coordinator marks a stage ready. The booking reference should then be recorded separately, so a preparation task cannot accidentally appear to confirm an inspection appointment.
How do you keep a returned item from being lost?
Return it to a named owner with a specific request and preserve the earlier submission. For example, the reviewer may need another photograph showing a concealed detail or a corrected document reference. The app should let the contractor answer that request without replacing the entire inspection pack. Test the case where two people upload evidence for the same item and a coordinator must choose which version to submit.
What information should appear in a site record?
Collect what the inspection workflow needs and control who can see it. The New Zealand Privacy Commissioner explains the Privacy Act 2020 principles, including collection, security and access. For this proposed workflow, separate homeowner contact details from construction photographs. Give a subcontractor access to assigned work and provide a practical way to remove an accidental image containing unrelated people or personal documents before it enters a shared pack.
What would a Christchurch pilot deliver?
A pilot can cover one inspection type from preparation through a returned item to a complete evidence export. Use your own anonymised examples to define the checklist and the status names. Remote demonstrations should include a phone with an interrupted upload and a replacement coordinator taking over the case. The written fixed-price scope identifies what is handed to the council process and what remains an internal contractor record.