Dunedin City Council explains heritage resource consents and scheduled heritage buildings in the 2GP. The protected scope can differ between buildings, so the proposed workflow should retain the applicable record for the particular property.
How should proposed heritage work enter the app?
Describe the affected building element before collecting a quotation. A proposed maintenance request could identify the surface or fitting, attach photographs and link the relevant heritage record. Ask the responsible reviewer to classify the next step: more information, specialist advice or an application. The app should preserve the proposal as submitted so later changes in materials or methods remain visible to the people reviewing the work.
What happens when a contractor proposes a substitute?
Create a reviewable variation tied to the original specification. The maintenance team should see what changed, why it changed and who accepted the replacement. I would make acceptance a separate action from uploading a product sheet. A useful test is a repair that pauses while a material is reviewed: the schedule should show the hold, and the work order should not quietly revert to an earlier approved version.
What privacy issue arises in a building photograph?
A photograph may also reveal occupants or personal possessions, so review its audience before sharing it. New Zealand’s Privacy Commissioner publishes the Privacy Act collection and security principles. The proposed design can support a restricted original and a reviewed image for contractor use. Access instructions, resident contacts and internal correspondence should have their own permissions rather than travelling automatically with every maintenance pack.
How can a small heritage project establish the workflow?
Use one building element and follow a proposed repair through review, variation and completed evidence. Your property team identifies the authoritative documents and the people who can approve work. I scope the software remotely and price that sequence in writing. The handover can include an export with the specification, decisions and final photographs, so the property record remains useful after the immediate contractor engagement ends.